Journeyman Pipefitter / Foreman
Mar 2019 – Present- Lead a 6-fitter crew on chilled-water, steam and condensate systems for hospitals and a 30 MW data center
- Installed 2,400 ft of 12 in. chilled-water header for a $4.8M central plant, passing every hydrostatic test first time
- Fabricated spools from isometrics in the shop, cutting field labor on two projects by roughly 900 hours
- Brazed and verified medical gas lines to NFPA 99 for a 120-bed tower, cleared on first third-party verification