Electromechanical Assembler
Jan 2023 – Present- Assemble motor control panels and wire harnesses from schematics and work instructions, averaging 105% of standard rate
- Crimp, strip and terminate wire to IPC/WHMA-A-620 and torque fasteners to spec, holding first-pass yield at 99.2%
- Run in-process continuity and hipot tests and log results in the MES before panels move to final inspection
- Suggested a kitting change at the station that cut part search time and saved about 20 minutes per shift