Industrial Engineer
Feb 2023 – Present- Rebalanced a 12-station pack-out line using time studies and takt analysis, raising units per labor hour 18%
- Built a FlexSim model of the receiving dock that justified a $380K layout change with a 14-month payback
- Set engineered labor standards for 60 tasks that now drive weekly staffing in the WMS
- Led 6 kaizen events with operators, cutting changeover time on a filling line from 50 to 28 minutes