Senior Reliability Engineer
May 2021 – Present- Raised OEE on 6 packaging lines from 68% to 81% through RCM studies and condition-based maintenance
- Launched vibration and ultrasound routes covering 420 critical assets, catching 35 bearing failures before breakdown
- Led 40 root cause analyses with 5 Whys and fault trees, cutting repeat failures by 55%
- Shifted planned maintenance from 45% to 78% of labor hours, saving $1.3M in annual downtime